Large-Scale Destination Charging Without Grid Upgrades
Enablelarge-scale AC and DC charging points across workplaces, offices,
hotels, airports and parking facilities — while intelligently sharing the available
power in real time.

The challenge
Destination charging sounds simple. Operating it at scale isn't.
AC charging at scale means hundreds of concurrent sessions
Car parks, offices, and retail locations were never designed for 20, 50, or 100 simultaneous EV
chargers. Without smart management, the building connection gets overwhelmed and the
charging experience breaks down.
Existing Grid Capacity Isn't Used Efficiently
Many destination charging sites already have enough available power—they just can't distribute it
intelligently. Fixed load allocation strands capacity on idle or low-demand chargers, reducing
charger utilization and slowing down charging sessions when power could be used elsewhere.
Multi-site operations run blind
Retail parks, offices, hotels — each with different building loads, grid contracts, and usage
patterns. Without a unified data layer, energy costs and fault response are guesswork.
Grid congestion across Europe is structural
New connections are delayed by years. Deploying more charge points without hitting grid
ceilings isn't a nice-to-have — it's the only path to growth.
Let’s change that
Dynamic Load Allocation
Serve more drivers. Stay under your grid limit.

Building Load Integration
Charging that fits around the building, not the other way around

Multi-site Management via HARMON-E
One platform. Every site. Full visibility

Reliable Charging Operations
Deliver a dependable charging experience for every visitor


Case study - Eiffage × PwC Belgium
250 charge points.
One multi-level garage.
Zero grid upgrades
Eiffage equipped PwC's Belgian headquarters with 250 AC charging points across a multi- level parking garage while operating within strict grid limitations.
Using HARMON-E:
- Real-time load balancing across all connected vehicles
- Dynamic power allocation based on actual demand
- Every vehicle receives the maximum possible charging power
- High-density charging without costly electrical upgrades
Features:
Case study
Premium guest charging.
Powered by solar. Managed within existing grid capacity.
A premium hotel chain in Sassenheim, Netherlands, wanted to expand EV charging for all guests while operating within the hotel's existing electrical capacity.
Using HARMON-E, the hotel combines intelligent load management with on-site solar energy to deliver a seamless charging experience without impacting hotel operations.
Using HARMON-E:
- Dynamic load balancing keeps EV charging within available grid capacity
- Real-time optimization of 3 DC fast chargers and 10 AC chargers
- Integrated solar energy maximizes on-site renewable energy consumption
- Reliable charging for every guest without disrupting hotel operations
Features:

The Benefits
The Benefits

Webinar
The power of co-located batteries: unlocking the full revenue potential

Why is Load & Energy Management fundamental for EV charging?

Build destination
charging that scales
Whether you're electrifying an office, parking garage, airport,
hotel or commercial real estate portfolio, HARMON-E helps you
deploy more chargers with the grid capacity you already have.









