The 2027 grid playbook in the BeNeLux: new DSO rules for charging sites

The 2027 BeNeLux grid playbook: new DSO rules for charging sites

Grid operators in Belgium and the Netherlands are changing the rules for charging sites. Fluvius now connects most new sites in Flanders on flexible terms, and the six Dutch regional DSOs are introducing capacity limits for public charging this winter. For new sites in congestion zones, no integration means no energisation.

The requirements are new to most CPOs. Belgium combines real-time control over a local IEC connection with day-ahead limits over OpenADR, while Dutch DSOs plan capacity limits over OpenADR. Get the setup wrong and your rollout stalls, or your chargers slow down every time the grid is under pressure.

FLEXECHARGE connects your sites to these grid operators with one setup across both countries. The strictest limit is always applied on site, and where there's a battery, it takes the reduction before your chargers do.

In this webinar, Robert Brehm, co-founder and CTO of FLEXECHARGE, walks through what Fluvius and the Dutch DSOs require, how the setup works in practice, and what to prepare for in 2027.

Get DSO-ready now and keep your chargers running.

→ Register now

‍

What you will learn:

  • what Fluvius and the Dutch regional DSOs require from charging sites, and on what timeline
  • how real-time IEC control and day-ahead OpenADR limits work together, and why the strictest limit always wins
  • what the technical setup involves, from DSO signals and measurements to the acceptance test at commissioning

What this means for your rollout:

  • You can sign a flexible connection or new grid contract knowing what's required and what happens to your site when capacity is limited.
  • Where a battery is on site, it absorbs the reduction first and helps protect charging availability.
  • The same setup works across Belgium and the Netherlands, and the flexibility you commit can become an extra revenue stream.

Speakers

Robert Brehm

co-founder & CTO at FLEXECHARGE

Register now
The 2027 BeNeLux grid playbook: new DSO rules for charging sites
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Sign up here

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Explore the rest of the Masterclass series

No items found.