The FLEXBOX Accelerates ELECTRA’s High-Power EV Charging Rollout in Germany

The FLEXBOX Accelerates ELECTRA’s High-Power EV Charging Rollout in Germany

Enabling fast, predictable expansion of high-power charging hubs across Germany despite complex DSO requirements

High-Power Charging stations
min de lecture

The FLEXBOX Accelerates ELECTRA’s High-Power EV Charging Rollout in Germany

The FLEXBOX Accelerates ELECTRA’s High-Power EV Charging Rollout in Germany
Category
High-Power Charging stations
Country
Size

The Challenge

As ELECTRA expanded its high-power EV charging network across Germany, grid compliance became a key bottleneck. Germany’s more than 800 Distribution System Operators (DSOs) each apply different grid codes, control interfaces, and approval processes, making standardised rollouts difficult.

At a charging station in Chemnitz, operated under the local DSO, inetz , ELECTRA needed to meet specific grid control requirements without turning the site into a custom engineering project. The challenge was clear: comply with local DSO rules while keeping rollout speed, costs, and scalability under control.

The Solution

To address these challenges, ELECTRA deployed the FLEXBOX, FLEXECHARGE’s new plug-and-play grid compliance and load management hardware, at its charging station in Chemnitz, the first ELECTRA site in Germany where the FLEXBOX was implemented.

The FLEXBOX enables ELECTRA to meet local DSO requirements while maintaining a standardised rollout model by providing:

  • A standardised technical interface to DSOs, ensuring compliance with local grid control requirements, including inetz.
  • Plug-and-play commissioning, eliminating the need for site-specific engineering or custom integrations
  • Local load and energy management, keeping charging performance stable under grid constraints
  • Local, cloud-resilient operation, ensuring deterministic site control even during grid events or connectivity outages
  • One local network for all energy assets, enabling coordinated management of chargers and future assets such as BESS or PV

By abstracting grid complexity into a single, standardised box, the FLEXBOX allows ELECTRA to deploy the same technical setup across sites, regardless of the local DSO, while accelerating grid approvals and reducing rollout risk.

Next Steps

Following the successful deployment of the FLEXBOX at the Chemnitz site, ELECTRA is positioned to replicate the same standardised grid compliance approach across additional German locations like Hausen bei Würzburg. With the FLEXBOX as a common technical foundation, future charging hubs can be deployed faster, with predictable costs and reduced engineering effort, regardless of the local DSO.

This positions ELECTRA to scale its high-power charging network across Germany with confidence, while remaining prepared for evolving grid requirements and future energy use cases.

Features in Use

No items found.

Solution & Benefits

Technical Overview

CHARGING HUB

8 x Alpitronic HYC300

MAX CHARGING POWER

2400 kW

GRID CONNECTION

3000 kW

CHARGING LIMIT

1800 kW*

PERFORMANCE PRICE

~45 €/kW

EXPECTED SAVINGS

30.000 € p.a.

Technical Overview

Locations

10

MAX CHARGING POWER

88-400kW per location

GRID CONNECTION

55-160kW per location

SOLAR PANELS

0-120kW per location

7 DC CHARGERS

0-1 per location

58 AC CHARGES

4-24 per location

Technical Overview

Locations

Hotel in Sassenheim

CHARGING STATIONS

10 AC (22 kW) + 3 DC (47 kW)

Energy Management

HARMON-E platform + Grid meter integration

GRID CONNECTIONS

524 kW

MAX CHARGING POWER

360kW

SOLAR CAPACITY

570 kW

“The FLEXBOX supports our scalable rollout and helps us deal with the different grid requirements we face across Germany.

Paul Tonini, Electra's Country Manager for Germany

Partagez cette publication
flexecharge-9a9cff.webflow.io/resources/customer-cases/the-flexbox-accelerates-electras-high-power-ev-charging-rollout-in-germany
No items found.

Download the Team
Energie case

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download the Volvo
Trucks x Floading case

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download the case study

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Electric vehicle parked at a charging station beside a gray building with orange accents in a parking lot.

Can you monetize your network?

Download our Whitepaper to discover how VPPs work, why they matter for the EV charging sector, and how CPOs can benefit from this game-changing technology.

Promotional image for a masterclass by Robert Brehm, co-founder and CTO of Flexcharge and Recharge, about deploying the first virtual power plant for high-power charging hubs.

Discover the advanced technology behind

Join this session to learn how Recharge and FLEXECHARGE launched the first VPP on high-power public chargers, setting a new benchmark for the industry.

market leaders 
choose

Scaling high-power EV charging despite complex grid requirements.

Learn how leading CPOs use the FLEXBOX to meet DSO grid control requirements, standardise site deployments, and roll out faster across Germany and Austria.

Register for the FLEXBOX on demand webinar

market leaders 
choose

Turning grid complexity into a scalable advantage for high-power EV charging.

Learn how the FLEXBOX standardises grid compliance, simplifies DSO integration, and accelerates the rollout of high-power charging hubs without custom engineering or rollout delays.

Explore the FLEXBOX solution

Scaling high-power EV charging despite complex grid requirements.

Scaling high-power EV charging despite complex grid requirements.

Learn how leading CPOs use the FLEXBOX to meet DSO grid control requirements, standardise site deployments, and roll out faster across Germany and Austria.

Turning grid complexity into a scalable advantage for high-power EV charging.

Turning grid complexity into a scalable advantage for high-power EV charging.

Learn how the FLEXBOX standardises grid compliance, simplifies DSO integration, and accelerates the rollout of high-power charging hubs without custom engineering or rollout delays.

Lectures recommandées (NB : en anglais)

market leaders 
choose

Get started with
FLEXECHARGE

Contact our team to learn more about what we can help you achieve with our open, vendor agnostic platform and powerful solutions.

Discover it now